December 2017 – February 2018 – we performed a detailed acquisition, processing and interpretation project in the Parnaíba Basin in two exploratory blocks composed of 255 AMT/MT stations.

October – December 2017 – we performed a detailed acquisition, processing and interpretation project in the Tucano Basin composed of 155 AMT/MT stations.

December 2017 – we performed a detailed acquisition, processing and interpretation project in the Recôncavo Basin composed of 9 AMT/MT stations.

December 2017 – we performed an acquisition, processing and interpretation project composed by 4 AMT/MT stations in Porto Velho, RO for the evaluation of soil resistivity for the installation of grounding electrodes for a transmission line.

September 2017 – we performed a detailed acquisition, processing and interpretation project in the Sergipe-Alagoas Basin composed of 93 AMT/MT stations.

May 2017 – we performed an acquisition, processing and interpretation project composed by 12 AMT/MT stations in Porto Velho, RO for the evaluation of soil resistivity for the installation of grounding electrodes for a transmission line.

April to May 2017 – we performed a regional acquisition, processing and interpretation project in the Tucano Basin composed of 80 AMT/MT stations and 169 gravity stations along two profiles totaling 320 km.

March to April 2017 – we performed a detailed acquisition, processing and interpretation project in the Sergipe-Alagoas Basin composed of 128 AMT/MT stations in 3D configuration

October to November 2016 – we performed a detailed acquisition, processing and interpretation project in the Sergipe-Alagoas Basin composed of 70 AMT/MT stations in 3D configuration.

In 2015 and 2016, we carried out several AMT/MT acquisition, processing and interpretation projects for the evaluation of soil resistivity for the installation of grounding electrodes for large structures in Altamira (13), Estreito and Ibiúna, SP (21), Minas Gerais (10), Rio de Janeiro (10);

May to August 2016 – we performed a detailed acquisition, processing and interpretation project in the Tucano Basin composed by 546 AMT/MT stations in 3D configuration.

January 2016 – we carried out a regional acquisition, processing and interpretation project in the Recôncavo Basin composed of 22 AMT/MT stations and 44 gravity stations along a 90 km profile.

September 2015 to March 2016 – we performed a detailed acquisition, processing and interpretation project composed of 259 AMT/MT stations in six exploratory blocks in the Recôncavo and Sergipe-Alagoas basins.

March to May 2015 – we performed a detailed acquisition, processing and interpretation project composed of 92 AMT/MT data stations in 3D configuration in the Recôncavo Basin.

December 2014 and January 2015 – we carried out a project to acquire, process and interpret 13 AMT/MT data stations in Estreito and 8 AMT/MT stations in Altamira for the implementation of grounding structures.

September 2014 – we performed a detailed acquisition, processing and interpretation project composed of 65 AMT stations in 3D configuration for prospecting kimberlites in Juína, Mato Grosso.

March 2014 – we carried out a project to acquire, process and interpret 36 AMT/MT data stations along 120 km for studies of the transfer zone between the Parecis and Paraná Basins, Mato Grosso.

January 2014 – Strataimage participated in a project to acquire, process and interpret 217 MMT (marine magnetotelluric) data stations in Uruguay.

October 2013 to July 2014 – Strataimage participated in a project for acquisition and processing of AMT/MT/TDEM data at 300 stations in the Parecis Basin.

September 2013 – we carried out a project to acquire, process and interpret 120 AMT stations in 3D configuration for prospecting pozzolana in Ipojuca, Pernambuco.

March to August 2012 – we carried out a project to acquire, process and interpret 213 MT data stations in the state of Rio Grande do Sul for regional studies.

August to November 2011 – we carried out a project to acquire, process and interpret 82 MT/TDEM data stations for oil and gas exploration along a seismic line in the Parnaíba Basin.

July to August 2011 – we carried out a project for the acquisition, processing and interpretation of 97 MT data stations for exploration of gold in Goiás.

November to December 2009 – we carried out a project to acquire, process and interpret 117 audio-magnetotelluric stations with controlled source (CSAMT) and 104 time-domain electromagnetic data stations (TDEM) in the Potiguar Basin.

November to December 2008 – we carried out a project to acquire, process and interpret 2,380 magnetometry and gamma-spectrometry data stations and 105 gravimetric stations in the Potiguar Basin.

March to April 2006 – we performed a quality control service for the acquisition of seismic data in the Espírito Santo land basin.